Demonstration environment. This is the same enterprise compensation solution we would operate in delivery, running on invented data. The live service runs on FedRAMP-authorized AWS and inherits that infrastructure’s controls, holding VA information inside the contractor system boundary that VAAR 852.239-70 and 852.239-73 require. Authorization for the application itself is granted by VA at award. Every figure shown is invented and is not VA information.

About this demonstration

What you are looking at, and what we can show you.

This site demonstrates the capabilities we would deliver in execution, running on invented data. The working platform runs separately on FedRAMP-authorized AWS, inherits that infrastructure’s controls, and keeps VA information inside the contractor system boundary that VAAR 852.239-70 and 852.239-73 require. Authorization for the application itself is granted by VA at award.

If seeing that environment would help your evaluation, we will walk you through it.

Request a walkthrough

Deliverables · 36C24C26R0004

What the VA actually receives.

The PWS names its deliverables task by task — kickoff and the IMPS, submission files and the published survey calendar, the purchased surveys, the market analysis and geographic differentials, the job architecture plan and mapped files, monthly reports and quarterly minutes. The schedule below lists every one, each linked to a rendered sample and to the platform module that produces it.

Program management

DeliverablePWSCadenceFormatsSample

Kickoff Package — Agenda, Minutes & Staff Roster

Produced in Program / IMPS →
PWS Task 1 / Subtask 1.1Once · within 10 business days of awardDOCX / PDFView →

Integrated Master Project Schedule (IMPS)

Produced in Program / IMPS →
PWS Subtask 1.2Living document · due date set at kickoff · incorporated by bilateral modMS Project / PDFView →

Monthly Progress Report

Produced in Program / IMPS →
PWS Task 6MonthlyDOCX / PDFView →

Quarterly Meeting Agenda & Minutes

Produced in Program / IMPS →
PWS Task 7 / Subtask 7.1QuarterlyDOCX / PPTX / PDFView →

Survey participation

DeliverablePWSCadenceFormatsSample

Survey Participation & Purchase Calendar

Produced in Survey Participation →
PWS ¶2.a · Subtask 2.3Published and maintained continuouslyInteractive / XLSXView →

Survey Submission Files & Transmittal Log

Produced in VA Data Intake →
PWS Subtasks 2.1, 2.2, 2.3Per surveyor participation windowXLSXView →

Market analytics

DeliverablePWSCadenceFormatsSample

Purchased Survey Register

Produced in Survey Library →
PWS Task 3 · ¶2.aPer survey cycleXLSX / PDFView →

National Market Analysis Report

Produced in Benchmarking →
PWS Subtask 3.1 · ¶2.c · Task 4 data specPer survey cycle · on demand from the ECSInteractive / XLSX / PDFView →

Geographic Differential Report

Produced in Geographic →
PWS Subtask 3.2 · ¶2.d · Task 4 specAnnual · refreshed with survey purchasesXLSX / InteractiveView →

Localized Duty-Station Survey Report

Produced in Geographic →
PWS Task 4 solution specOn demand · any duty station, any occupationInteractive / XLSXView →

Pay Setting Worksheet

Produced in Pay Workbench →
PWS Task 4 solution specOn demand · per pay actionInteractive / PDFView →

AI Compensation Review — Adjustments & Disparity

Produced in Pay Equity AI →
PWS Task 4 solution specQuarterly · on demandInteractive / PDFView →

Job architecture

DeliverablePWSCadenceFormatsSample

Job Architecture Implementation Plan

Produced in Job Architecture →
PWS Task 5 · ¶2.eDue by end of the base year · delivered to the CORDOCX / PDFView →

Mapped Employee Files & Match Validation

Produced in Job Architecture →
PWS Subtasks 5.1, 5.2Initial mapping, then per refreshXLSXView →

Benchmarking Findings — Composites, Trends & Outliers

Produced in Benchmarking →
PWS Subtask 5.3Per survey cycleInteractive / PDFView →

Enablement

DeliverablePWSCadenceFormatsSample

Instruction Guide & Training (with Annual Updates)

Produced in Enterprise Compensation Solution →
PWS Subtasks 4.1, 4.2Initial, then annual updates on an agreed scheduleDOCX / PDF / TrainingView →

Beyond the schedule

Supplementary artifacts the same platform produces.

Five downloadable, data-heavy samples that go past the named deliverables — physician market-pay panels, SSR justification evidence, executive market-position briefings, and more. Same engine, same audit trail.

Every artifact below is a downloadable sample — HSG-branded, data-heavy, authored by Jelani House, Deputy PM & Platform Lead. Real BLS OEWS / VA OIG data where shown; commercial blends illustrative.

Task 2 · §7431

Physician Market-Pay Panel Packet

Blended SullivanCotter/MGMA/AMGA percentiles by specialty and tier for §7431 base-plus-market-pay determinations.

Cadence

Per compensation panel

Audience

Compensation Panel · Service Chief

FormatPDF
Download sample

Task 2

Occupation Benchmark Sheet

Per-occupation P10–P90, compa-ratio, market index, range penetration, and source provenance.

Cadence

On demand

Audience

OCHCO · HR Specialist

FormatXLSX
Download sample

Task 2 · Hybrid SSR

Special Salary Rate (SSR) Justification

Title 38 Hybrid SSR request evidence package built on ECRI allied-health data.

Cadence

As requested

Audience

OCHCO · OPM

FormatPDF
Download sample

Task 4 · Dashboards

Executive Market-Position Dashboard

VISN- and national-level competitive position, shortage-risk overlay, and refresh status.

Cadence

Quarterly

Audience

VISN Leadership · OCHCO

FormatInteractive
Download sample

Task 5 · Catalog

Job-Architecture Catalog Export

The full effective-dated occupation catalog with benchmark crosswalk and change history.

Cadence

Versioned

Audience

VA HR Systems

FormatXLSXAPI
Download sample

Every figure traces back to a source.

Each deliverable is generated from the catalog and the licensed survey data, with the AI-generated values and human overrides recorded in the AI/Expert Reconciliation Log. Pull any number and the platform shows the survey, the vintage, and the reviewer who signed it.